VASUNDHARA COST INTELLIGENCE

Know what
building will cost.

Start with three inputs: PIN code, settlement type and carpet area. The public intake captures the project inputs needed for a transparent regional planning model.

CHHATTISGARHFIRST LIVE REGIONPIN × Setting × Carpet Area

VASUNDHARA OPERATING MODEL

Cost Intelligence is the bridge between place and project.

India Intelligence determines where a workable operating cell exists. The Cost Intelligence layer then converts that location and project brief into an evidence-led cost baseline that can be handed to the professional network, execution workflow and Client Control layer.

01 · GEOGRAPHY

Locate

PIN, locality, settlement, district, access and service-cell constraints.

02 · CUSTOMER

Qualify

Project trigger, site status, timeline, area, requirements and delivery complexity.

03 · SERVICE

Scope

Define what Vasundhara is being asked to solve and how much estimation depth is required.

04 · COST INTELLIGENCE

Model

Typology → quantities → materials → labour → logistics → productivity → evidence status.

05 · PROFESSIONAL NETWORK

Match

Translate the costed scope into the architect, engineer, contractor and specialist requirements.

06 · EXECUTION

Control

Carry the baseline into procurement, milestones, site conditions, changes and quality checks.

07 · CLIENT CONTROL

Report

Keep the owner informed about budget, approved scope, movement, decisions and risks.

Evidence rule: official schedules, observed market evidence and modelled productivity remain distinguishable. A production rate is released only when its evidence gate is satisfied.

WHY THIS EXISTS

A construction budget is not a national ₹/sq ft number.

The same house can cost materially different amounts depending on where it is built, how accessible the site is, which materials are locally available, what trades are present, and how the building is specified.

Vasundhara therefore starts with a simple public planning computer and progressively replaces its visible assumptions with better regional evidence.

THE COST STACK

Every rupee has a reason.

The public intake is deliberately simple; the underlying intelligence remains component-based.

01

Materials

Product, grade, unit, source market, wastage and current reference/market rate.

02

Labour

Trade-specific wages and productivity for the region.

03

Logistics

Freight, handling, site access and distance from source.

04

Installation

Equipment, fixing, preparation and execution productivity.

05

Project economics

Contractor overhead, professional services and contingencies.

06

Confidence

Every estimate carries assumptions and an uncertainty range.

THE VASUNDHARA COST PIPELINE

From material intelligence to a project budget.

01 Materials Atlas02 Material intelligence03 Regional rates04 Rate analysis05 Project assemblies06 Budget estimate

REGIONAL BY DESIGN

India is a network of construction markets.

Chhattisgarh is the first live state. District and locality resolution begins with the viewer's PIN and will progressively connect to deeper regional evidence.

Chhattisgarh · liveMadhya Pradesh · nextGujaratMaharashtraBiharJharkhandUttar Pradesh
PUBLIC ESTIMATE
PINLocation
State · district · locality
TYPESetting
Village / city / town / society / colony / community
AREACarpet area
Square feet

PIN-DRIVEN CONSTRUCTION INTELLIGENCE

Enter a PIN. Know the building market around it.

Use the same PIN Intelligence system as the Vasundhara front page. One location key connects postal geography, settlement, administration, urban access and the 200 km service network.

Shared runtime. This page no longer maintains a second PIN dashboard. Submit a six-digit PIN and the production PIN Intelligence interface opens as the same full-screen dashboard used on the front page.

READY TO BUILD?

Turn the estimate into a real project brief.

If you have a plot, an existing house or a renovation project, send Vasundhara the location, area, budget and stage. We will review the brief and identify the appropriate next service.

Start a project enquiry →

THE VASUNDHARA COST COMPUTER

Put the house into the computer.

Use the same transparent pricing core behind the technical POC. Change the basic project geometry and construction tier, then inspect a provisional planning number rather than a black-box ₹/sq ft rate.

Research / planning layer. The numerical output is provisional and remains subject to evidence, site access, drawings, specifications and field validation.

PLANNING OUTPUTEnter the project geometryThe computer will expose total cost, derived ₹/sq ft and the explicit planning band.

COST ANATOMY

See the factors behind the number.

A serious construction estimate is not one rate. The engine decomposes cost into material quantity, specification, source price, freight, handling, wastage, labour, productivity, plant, access, installation and evidence quality.

QUANTITY—measured quantity × component coefficient
×
BASE MATERIALEvidence pendingspecification + source market + date + tax basis
+
LOGISTICSSource → sitedistance + vehicle + loading + unloading + access
+
EXECUTIONLabour + plantcrew composition × productive output
=
RELEASEFAIL-CLOSEDonly evidenced inputs can become a production rate

ENGINEERING EVIDENCE

See the methodology behind every assembly.

The Cost Intelligence backend now exposes the 28-assembly methodology map, dependency resolution, vocabulary reconciliation and production-gate state as a live technical audit. Nothing is promoted merely because a methodology exists.

28 assemblies28 methodology rules8 resolved dependency rolesFAIL-CLOSED production release
Open the live methodology & assembly audit →

THE 28-ASSEMBLY REGISTER

The construction systems now mapped into Cost Intelligence.

This is the engineering register behind the public estimator: canonical assemblies, units, methodology bindings, dependencies and the evidence gate that still stands between research and production.

28 assemblies shownEvery card remains fail-closed until its independent evidence gates pass.

Loading the canonical 28-assembly registry…

DATA READINESS

The rate book is being built region by region.

Loading regional data layer…

— tracked components— pending validation— production-ready

The public quick estimator is a planning layer. Detailed SOR line-item estimation remains available separately for technical users.

PUBLIC ESTIMATOR

Three inputs. A disciplined project intake.

Enter PIN, settlement type and carpet area. The Chhattisgarh project intake captures the information required before numerical estimation can be released.

Open Chhattisgarh project intake →
MODEL STATUSVALIDATION-GATEDPIN × setting × carpet areaNo numerical output until the production evidence gates pass

RESEARCH STANDARD

Official schedules first. Market evidence next. Modelled installation last.

Government schedules provide the reproducible construction baseline. They are kept separate from observed private-market procurement and site-specific installed economics.

CPWD plinth area ratesState PWD schedulesLabour notificationsMarket observationsRegional freightProductivity studies

TECHNICAL LAYER

Detailed SOR, evidence and calibration tools remain underneath.

The simplified public intake is the front door. The engineering model, evidence workbench, developer residual benchmark and calibration computers remain available for deeper technical work.

Detailed SOR computer →Evidence workbench →Residual benchmark →RCC research calibration →Three-way calibration →