Vasundhara Cost Intelligence · Engineering Workbench
RCC calibration ledger.
The first executable Cost Computer ledger: explicit quantities multiplied by explicit evidence ranges. This is a calibration instrument, not a released construction rate.
PRODUCTION GATE: CLOSED
Research observations are deliberately prevented from becoming a project estimate until commercial basis, productivity, logistics and cross-check evidence are complete.
Research observations are deliberately prevented from becoming a project estimate until commercial basis, productivity, logistics and cross-check evidence are complete.
Calibration basis
M25 ready-mix₹4,261–5,327 / cum
Raipur market observation; delivery within city limits stated by source. Research-only.
Fe500D reinforcement₹52–60 / kg
Raipur dealer-to-retail observation. Exact brand, GST and delivered-site basis unresolved.
Foundation formwork₹165–250 / sqm
SECL Manikpur bidder distribution; commercial reconciliation pending.
Computed component envelope
Concrete · 1.000 cum₹4,261–5,327
Rebar · 100 kg₹5,200–6,000
Formwork · 5 sqm₹825–1,250
Calibration envelope₹10,286–12,577
This sum is a component calibration envelope only. It is not an installed RCC rate and must not be used as a project budget.
What happens next
- Normalize two independent Fe500D quotations for exact diameter, brand/mill, GST and delivered-site basis.
- Capture productive steel-fixer output with crew composition.
- Reconcile formwork scope and commercial basis.
- Cross-check against a real project BOQ/BBS.
- Promote only the validated component into the production rate layer.
Generated from cost-computer-rcc-calibration-2026-09-19.json. Labour statutory floors remain compliance baselines, not productivity-derived rates.