Roles are not a list. They are a project system. This matrix connects each project stage to the functions, capabilities, outputs and dependencies needed to move from evidence to a finished place.

01 · OPERATING LOGIC

Project → stage → function → role → evidence → output.

The matrix is designed to become the bridge between the national workforce atlas and a live project brief. It prevents the common failure mode of appointing impressive titles without defining what must actually be delivered.

01

Define the stage

Discovery, planning, design, approvals, procurement, construction, commissioning or occupation.

02

Define capability

Select the functional role and competency level required rather than defaulting to a generic designation.

03

Verify evidence

Portfolio, site record, drawings, references, assessment, craft test, licence or other appropriate evidence.

04

Contract the output

Specify acceptance criteria, dependencies, duration and engagement model before mobilisation.

02 · CORE PROJECT MATRIX

A working staffing skeleton for commissioned projects.

Project stage
Function / role
Required capability
Primary output
Dependencies / evidence
Discovery
GIS / Site Intelligence Specialist
SF-O03
Spatial data, mapping, site constraints, remote sensing, field verification.
Site intelligence base, constraint map and verified spatial dataset.
Survey data · field notes · GIS evidence
Discovery
Community / Stakeholder Liaison
SF-O05
Local-language communication, interviewing, consent, stakeholder mapping.
Stakeholder record, local priorities, risks and communication pathway.
Local references · interview protocol
Brief + design
Lead Architect
SF-D01
Brief synthesis, spatial planning, climate response, design leadership.
Approved concept, coordinated design direction and decision record.
Registration where required · portfolio · client brief
Engineering
Structural Engineer
SF-E01
Structural analysis, detailing, material behaviour, code compliance.
Structural scheme, calculations and construction-ready details.
Architectural set · soil data · applicable standards
Cost + procurement
Quantity Surveyor / Cost Manager
SF-S03
Measurement, BOQ, rate analysis, tender comparison, cost control.
Cost plan, BOQ, procurement packages and variance record.
Drawings · specifications · market rates
Site mobilisation
Site Supervisor / Foreman
SF-S02
Crew coordination, sequencing, setting-out support, workmanship control.
Daily work fronts delivered safely to the required sequence and quality.
Drawings · method statements · skilled crews
Craft execution
Stone / Lime / Wood / Metal Specialist
CRAFT
Material-specific hand skill, tooling, tolerances and finish discipline.
Accepted sample and installed work meeting the agreed craft standard.
Sample panel · master evidence · tools
Coordination
BIM / Information Manager
SF-O08
Model coordination, information naming, revision control and issue tracking.
Coordinated information set and reliable project record.
Discipline models · drawing register
Completion
Quality + Documentation Team
SF-S04
Inspection, snagging, photographic records, handover documentation.
Accepted completion record, snag closure and handover pack.
Test certificates · as-builts · O&M records
Important: this is a staffing architecture, not a claim that every project needs every role. A small rural house may combine several functions in one competent person; a complex estate, hospitality project or village programme may require multiple specialists at different competency levels. The staffing decision should follow project risk, complexity and output—not headcount.

03 · NEXT LAYER

From matrix to live project staffing.

The next operational layer is a project staffing sheet that selects roles, competency levels, candidate geography, evidence, mobilisation dates, engagement model, rate basis, dependencies and acceptance criteria for one commissioned project.