VASUNDHARAINDIA / INDORE–MALWA DOSSIER

INDORE–MALWA DOSSIER

Part 4 of 6

A readable section of the Indore–Malwa research and operating dossier.

PASS 113 · MEP COORDINATION

MEP Coordination becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 114 · WATERPROOFING STRATEGY

Waterproofing Strategy becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 115 · FACADE CONTROL

Facade Control becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 116 · ROOFING CONTROL

Roofing Control becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 117 · FLOORING STANDARDS

Flooring Standards becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 118 · JOINERY COORDINATION

Joinery Coordination becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 119 · LIGHTING COORDINATION

Lighting Coordination becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 120 · LANDSCAPE INTEGRATION

Landscape Integration becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 121 · DESIGN FREEZE

Design Freeze becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 122 · CLIENT SELECTIONS

Client Selections becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 123 · SAMPLE APPROVAL

Sample Approval becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 124 · MOCK-UP STRATEGY

Mock-Up Strategy becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 125 · SPECIFICATION HIERARCHY

Specification Hierarchy becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 126 · DRAWING REVIEW

Drawing Review becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 127 · REVISION MANAGEMENT

Revision Management becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 128 · CONSTRUCTABILITY REVIEW

Constructability Review becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 129 · VALUE ENGINEERING

Value Engineering becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 130 · DESIGN CHANGE DISCIPLINE

Design Change Discipline becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 131 · SCHEDULE BASELINE

Schedule Baseline becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 132 · CRITICAL PATH MANAGEMENT

Critical Path Management becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 133 · MILESTONE RELIABILITY

Milestone Reliability becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 134 · LOOK-AHEAD PLANNING

Look-Ahead Planning becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 135 · DELAY DETECTION

Delay Detection becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 136 · RECOVERY PLANNING

Recovery Planning becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 137 · DEPENDENCY MANAGEMENT

Dependency Management becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 138 · LONG-LEAD PLANNING

Long-Lead Planning becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 139 · WEATHER ALLOWANCES

Weather Allowances becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 140 · PROGRAMME CLOSEOUT

Programme Closeout becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 141 · PROCUREMENT GOVERNANCE

Procurement Governance becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 142 · SUPPLIER TENDERING

Supplier Tendering becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 143 · BID COMPARISON

Bid Comparison becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 144 · COMMERCIAL NORMALISATION

Commercial Normalisation becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 145 · TECHNICAL EVALUATION

Technical Evaluation becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 146 · PURCHASE ORDERS

Purchase Orders becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 147 · DELIVERY SCHEDULING

Delivery Scheduling becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 148 · GOODS INSPECTION

Goods Inspection becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 149 · STORAGE CONTROL

Storage Control becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 150 · SUPPLIER SCORECARDS

Supplier Scorecards becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 151 · SUBCONTRACTOR STRATEGY

Subcontractor Strategy becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 152 · PACKAGE DEFINITION

Package Definition becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 153 · WORK ALLOCATION

Work Allocation becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 154 · SUBCONTRACT TERMS

Subcontract Terms becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 155 · INTERFACE MANAGEMENT

Interface Management becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 156 · PRODUCTIVITY TRACKING

Productivity Tracking becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 157 · PERFORMANCE REVIEW

Performance Review becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 158 · CORRECTIVE ACTION

Corrective Action becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 159 · REPLACEMENT PROTOCOL

Replacement Protocol becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 160 · CLOSEOUT ACCOUNTABILITY

Closeout Accountability becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 161 · SITE ENGINEERING

Site Engineering becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 162 · SETTING OUT CONTROL

Setting Out Control becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 163 · MEASUREMENT VERIFICATION

Measurement Verification becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 164 · CONCRETE QUALITY

Concrete Quality becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 165 · MASONRY CONTROL

Masonry Control becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 166 · PLASTER QUALITY

Plaster Quality becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 167 · WATER TESTING

Water Testing becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 168 · ELECTRICAL TESTING

Electrical Testing becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 169 · PLUMBING TESTING

Plumbing Testing becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 170 · COMMISSIONING READINESS

Commissioning Readiness becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 171 · QUALITY MANAGEMENT PLAN

Quality Management Plan becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 172 · INSPECTION TEST PLANS

Inspection Test Plans becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 173 · HOLD POINTS

Hold Points becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 174 · WITNESS POINTS

Witness Points becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 175 · NONCONFORMANCE CONTROL

Nonconformance Control becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 176 · ROOT CAUSE ANALYSIS

Root Cause Analysis becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 177 · REWORK PREVENTION

Rework Prevention becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 178 · DEFECT PREVENTION

Defect Prevention becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 179 · QUALITY RECORDS

Quality Records becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 180 · INDEPENDENT INSPECTION

Independent Inspection becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 181 · COMMERCIAL FORECASTING

Commercial Forecasting becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 182 · BUDGET BASELINE

Budget Baseline becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 183 · COMMITMENT FORECAST

Commitment Forecast becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 184 · ESTIMATE AT COMPLETION

Estimate at Completion becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 185 · MARGIN FORECAST

Margin Forecast becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 186 · CONTINGENCY MANAGEMENT

Contingency Management becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.

PASS 187 · COST VARIANCE

Cost Variance becomes a controlled part of the Vasundhara operating model.

Define the standard, assign ownership, establish the decision gate and measure whether the practice improves predictable delivery. This pass extends the Indore–Malwa launch system beyond project execution into a repeatable institutional capability.